Our Products

Installation & Erection of Tanks & Vessels

imac

The Tanks shall rest on proper foundation and top surface of the foundation shall be placed with fine sand up to 2” thick or may be used thick layer of rubber mat to avoid damage of the bottom tanks and In installation/erection time the tanks shall lift with lifting hooks and advise to use water before using original liquid/fluids to take care of leakage.

FRP tanks can be repaired at site easily without any necessary of the heavy equipments. In the prevent of damage or crack can be repaired by building up FRP layer by hand lay up is required over large portion is advised.

img-theme

Ipad Mini

Lorem ipsum dolor sit amet, adipiscing consectetur elit.

$16.89

Add to cart Details